Skip to content
Temporary site power on a Dee Why rebuild
Level 2 electrical

Temporary Builders Supply Northern Beaches

Safe site power from day one, placed where trucks, scaffold and excavators won't hit it.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

Knock-down rebuilds are a constant across the Northern Beaches, from the flat streets of Dee Why, Collaroy and Narrabeen to steep blocks in Newport, Avalon and Bilgola. Every one needs site power from the first day. A temporary builders supply gives the builder safe power for tools, lighting and amenities until the new home’s permanent supply is connected.

Overhead streets

Most beach streets are overhead. A temporary pole goes up near the frontage and takes a service from the street pole.

Underground streets

Newer estates and some rebuilt streets are underground. A site board connects at the pit.

Steep sites

When a block falls away from the street, the site supply usually sits up at the frontage, protected, with leads run down the site. We position it so excavators, concrete pumps and trucks have room to work.

Bush and trees

On treed blocks, site gear has to be clear of tree protection zones and away from branches that could fall in a storm.

The rebuild sequence

  1. Permanent disconnection of the old house via power disconnection and reconnection
  2. Site power installed, often on the same visit
  3. Demolition and construction run on site power
  4. The new home connected and the site supply removed

If the new home will have a pool, EV charger or lift, get the three phase power upgrade application in early.

Coastal exposure

Near the surf, salt and wind work on site equipment for months. We use well-sealed enclosures, brace poles against gusts and suggest a check after any big storm.

What we need from you

Site address, builder’s contact, a site plan, single or three phase, start date and the retailer account details.

Safety on site

We install with the required protection and come back if the site supply is damaged. On overhead streets, cranes and concrete pumps must keep clear of street wires; we can advise.

Handover

The permanent supply is connected and certified, and the temporary pole or board comes out so the frontage can be finished.

Where we work

Builders across the beaches book site power with us, including rebuilds in level 2 electricians Dee Why and level 2 electricians Brookvale.

Moving the site supply

As the build progresses, the site supply sometimes has to move: the driveway is poured, scaffold changes or landscaping starts at the frontage. We can relocate it mid-build with a few days’ notice.

Accidental damage

Excavators, trucks and concrete pumps occasionally strike temporary poles or leads. If that happens, stop work nearby, keep people clear and call us to make it safe and check it.

Getting the retailer account right

A site supply can’t be energised without an open electricity account in the builder’s or owner’s name. It’s the most common cause of delays on the day, so set it up early and send us the details.

Small renovations

Not every job needs separate site power. For a kitchen, bathroom or small extension with the family still living in the house, the builder usually runs off the existing supply. We’ll tell you if a temporary supply is worth it.

Single or three phase on site

Most residential sites run on single phase. Big rebuilds with lifts to commission, large compressors or several heavy-tool trades at once may want three phase, especially if the finished home will be three phase anyway.

Rebuilds in flood-prone streets

Near Narrabeen, Dee Why and Manly lagoons, site boards are mounted above likely flood levels and leads are kept off low ground. After heavy rain, have the site supply checked before work resumes.

Joining up the jobs

Most rebuilds need the old house disconnected, site power installed and, at the end, the new home connected. Booking all three with one Level 2 contractor keeps dates and paperwork joined up.

Weekend and early starts

If your crew starts early or works Saturdays, tell us when booking so site power is energised and tested before the first trades arrive on day one.

Book it

Call the Northern Beaches level 2 electricians with your start date.

Updated

Pricing depends on whether a pole or board is needed, single or three phase, the distance to the connection point and removal at the end. We confirm the price after a look.

What good temporary builders supply looks like

Close-up of temporary builders supply on a home in the Northern Beaches area
What temporary builders supply looks like up close on a typical Northern Beaches area home.
Signs that temporary builders supply needs attention
Typical signs that it needs attention.

Temporary Builders Supply in the Northern Beaches: step by step

  1. Pick the spotClear of the driveway, excavation and deliveries.
  2. PaperworkAusgrid notified, retailer account confirmed.
  3. Install and testTemporary pole or site board connected.
  4. Remove at handoverPermanent supply live, site supply taken away.

Temporary Builders Supply questions in the Northern Beaches

Something else on your mind? Call 02 9158 9937 and ask.

Our site slopes steeply away from the street. Where will the site pole go?

Usually near the frontage where trucks can't reach it, with the builder running leads down the site.

Can demolition, disconnection and site power happen on one day?

The disconnection and site power usually can, before the demolition crew starts.

Do we need a retailer account?

Yes. Site power needs an open account before it can be energised.

Need Level 2 electricians on the Northern Beaches?

📞 Call now Free quote