Skip to content
Undergrounding through a bush garden in Avalon
Level 2 electrical

Overhead to Underground Conversion Northern Beaches

The wire through your gums replaced with cable in conduit, so storms and falling limbs can't take your power out.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

On the Northern Beaches, the biggest threat to an overhead service line is usually a tree. Spotted gums, angophoras, Norfolk pines and palms crowd the streets and gardens, and in a strong southerly or an east coast low they drop limbs straight onto wires. On steep Pittwater blocks, lines run long distances through bush to reach the house, sometimes via private poles. An overhead to underground conversion takes the service out of the air and puts it in conduit, where wind and branches can’t reach it.

Why owners go underground

Storms. The single most common reason. Every big blow brings lines down somewhere on the peninsula.

Bushfire. In fire-prone pockets, an underground supply removes a wire through the canopy.

Private poles. An underground run can remove the need for an ageing private pole.

Rebuilds and pools. A new driveway, deck, pool or second storey can’t go under a live line.

Views. On blocks looking over Pittwater or the ocean, a wire across the outlook is the first thing owners want gone.

What’s involved

We fit conduit up the street pole (or connect at a pit where the street is already underground), trench or bore across the property and run the cable to the meter. Long runs get pits along the way. Ausgrid connects at the pole, and we take down the old line and bracket.

Rock, roots and slopes

Much of the peninsula sits on Hawkesbury sandstone, and gardens are full of established trees. We plan routes that avoid the worst rock and root zones, use directional boring under paths and trees where it makes sense, and cut rock carefully where we must. On steep slopes, trenches are benched and backfilled so they don’t wash out in the next storm.

Septic, stormwater and other services

Some Pittwater homes still have septic systems or absorption trenches, and most blocks have stormwater lines running downhill. We locate services before digging and keep clear of them.

Combining it with other work

If the mains are old, replace them as part of the job with a consumer mains upgrade. If an all-electric fit-out or EV is coming, size the conduit for a three phase power upgrade now so you don’t dig twice.

The application

Undergrounding needs an Ausgrid application. It confirms the connection point and any network requirements. We lodge it, answer questions and book the cut-over when it’s approved.

Your garden afterwards

We backfill, compact and reinstate to the standard agreed in the quote. Lawns, mulch and gravel are restored; for paving and landscaping we can work with your landscaper.

How long it takes

Most residential runs take one to three days of trenching or boring, depending on length and rock. The cut-over is a short outage.

Where we work

Undergrounding is booked right across the peninsula, especially on bush blocks in level 2 electricians Avalon Beach and steep streets in level 2 electricians Newport.

Bushfire-prone land

Large parts of the peninsula are mapped as bushfire prone. If you’re rebuilding to a bushfire standard, running the supply underground removes a wire through the canopy.

Get a fixed price

Ask the level 2 electricians Northern Beaches team for a site visit and written price.

Updated

The price depends on the length of the run, the slope, how much rock and how many tree roots are in the way, whether boring is needed and Ausgrid's requirements at the pole. We give a fixed figure after a site visit.

What good overhead to underground conversion looks like

Close-up of overhead to underground conversion on a home in the Northern Beaches area
What overhead to underground conversion looks like up close on a typical Northern Beaches area home.
Signs that overhead to underground conversion needs attention
Typical signs that it needs attention.

Overhead to Underground Conversion in the Northern Beaches: step by step

  1. Walk the routePole to meter, around rock, roots, septic lines and stormwater.
  2. Ausgrid applicationWe lodge it and follow it through.
  3. Trench or boreConduit laid with pits where the run is long.
  4. Cut overNew cable live, overhead line and fittings removed, certified.

Overhead to Underground Conversion questions in the Northern Beaches

Something else on your mind? Call 02 9158 9937 and ask.

Our garden is full of angophoras. Will trenching damage the trees?

We route around root zones where we can and bore under them where we can't. Talk to your arborist if a tree is protected.

We're on sandstone. Is undergrounding still possible?

Yes. Rock slows the job and affects the price, but we cut or bore through it regularly.

Can going underground remove our private pole?

Often, yes. An underground run from the street pole can replace the private pole altogether.

Need Level 2 electricians on the Northern Beaches?

📞 Call now Free quote