Power Disconnection and Reconnection Northern Beaches
Your supply isolated at the Ausgrid side so builders, roofers, painters and tree crews can work safely.
The main switch only turns off the circuits inside your house. The line from the street or private pole, the bracket or raiser, the mains and the service fuse stay live. Anyone working near them, whether a roofer on a Narrabeen cottage, a builder raising a Collaroy beach house or an arborist pruning a gum over the line in Avalon, needs the supply isolated on the network side. Power disconnection and reconnection is how that’s done safely.
Re-roofs
Roofers can’t work around a live raiser. We isolate for the roofing days, then replace a corroded raiser and flashing before reconnecting, often with a point of attachment upgrade.
House raises
Lifting a house to build in underneath is popular on flat blocks near the lagoons and beaches. The supply has to be disconnected before the lift and reconnected at the new height, usually with new mains and a moved attachment point.
Tree work
Arborists pruning or removing trees near the service line need it isolated. On bush blocks with private poles, the whole private line may need isolating. We coordinate dates directly with the tree crew.
Painters and renderers
Facade work beside a bracket or raiser needs isolating or covering.
Renovations and extensions
Second storeys, decks and rear additions all change where the supply runs. We isolate for the builder, then reconnect to the new position.
Demolition
Before a knock-down, the supply is permanently disconnected and the service removed. A temporary builders supply can go in on the same visit so the builder has power from day one.
Switchboard changes
If your electrician is replacing the switchboard, we book the same day so the house is only off once.
Private poles
Homes on private poles may be isolated at the last network point, which can affect the whole private line. We check how your home is supplied first.
On the day
We isolate at the right point, secure it against accidental re-energising and confirm in writing for the builder. At reconnection we check the fittings and clearances, reconnect, test and certify.
Where we work
We isolate for trades all over the peninsula, including re-roofs in level 2 electricians Mona Vale and raises in level 2 electricians Narrabeen.
Permanent or temporary
Tell us which you need when you book. A temporary isolation ends with the home reconnected once the trades finish. A permanent disconnection, before a demolition, removes the service back to the pole or pit and closes off the connection. The paperwork and the work on the day are different.
Keeping the trades moving
Builders on the beaches juggle tides of subcontractors, and a missed isolation can hold up a whole week. We give a firm booking, turn up when we say, and confirm the isolation in writing so the site supervisor can sign it off before anyone climbs a ladder.
Covering instead of isolating
On some jobs, insulated covers can be fitted to the line so the household keeps power while trades work nearby at a safe distance. Whether that’s possible depends on the distances, the type of work and Ausgrid’s rules. We’ll advise after a look.
Checks before power goes back on
Reconnection is a good moment to inspect the attachment point, conduit and meter box. Near the surf, that’s often when corrosion is found. If a fitting is close to failing, we’ll tell you on the day so it can be replaced while the power is already off.
Neighbours
On some streets, neighbouring homes share a pole or a span of line. We check how nearby homes are supplied so an isolation for your job doesn’t leave the house next door without warning.
Paperwork for the site file
Builders and roofers get written confirmation of when the supply was isolated and when it was restored, which keeps safety records straight.
Book it
Call the level 2 electricians Northern Beaches team with your dates. For anything unsafe right now, call our emergency level 2 electrician line.
Updated
What good power disconnection and reconnection looks like
Power Disconnection and Reconnection across the Northern Beaches
Power Disconnection and Reconnection in the Northern Beaches: step by step
- Book the datesWe line up with your builder, roofer or arborist.
- Lodge with AusgridNotification submitted ahead of the work.
- IsolateSupply made dead and secured at the correct point.
- Reconnect or removeBack on and tested, or removed for demolition.
Power Disconnection and Reconnection questions in the Northern Beaches
Something else on your mind? Call 02 9158 9937 and ask.
Our arborist needs to prune near the line. Can you isolate it?
Yes. We isolate the service so the arborist can work safely, then reconnect when they're done.
We're raising our beach house. Does the power need to be disconnected?
Yes. The supply is disconnected while the house is lifted and reconnected at the new height.
How much notice do you need?
A week is ideal so the Ausgrid notification can be lodged.